








Take A Note - Record Lite Project Planner
Take A Note - Record Lite Project Planner
bullet journal, or monthly scheduling. Within the 40 pages of project planning layouts, each page is listed with monthly numerals. The left-hand side shows vertical timelines from up to down; the format on the right-hand side then rotates 90 degrees to present timelines horizontally from left to right. When in use, this format provides an excellent overview for monthly projects, or serves as a perfect habit tracker.
The Record series from Take A Note are specifically centered on the concept of improving everyone's “RECORD” experience. Notebook products in this series are all manufactured with Tomoe River Paper, and find perfect balance in between minimalist aesthetics and multi-functional purposes. Notebooks in the Record series can be assorted together with the Washable Paper Book Cover or the Transparent PVC Book Cover.
- Size: 3.7 in x 6.6 in (9.5cm x 17cm)
- Tomoe River Paper 68 gsm
- 60 pages total (40 pages of project plan, 18 pages of grid note, 1 welcome page, and 1 personal info page)
- 4mm grid
- More Take A Note
Product Information
Product Information
Shipping & Returns
Shipping & Returns
Description
Take A Note - Record Lite Project Planner
bullet journal, or monthly scheduling. Within the 40 pages of project planning layouts, each page is listed with monthly numerals. The left-hand side shows vertical timelines from up to down; the format on the right-hand side then rotates 90 degrees to present timelines horizontally from left to right. When in use, this format provides an excellent overview for monthly projects, or serves as a perfect habit tracker.
The Record series from Take A Note are specifically centered on the concept of improving everyone's “RECORD” experience. Notebook products in this series are all manufactured with Tomoe River Paper, and find perfect balance in between minimalist aesthetics and multi-functional purposes. Notebooks in the Record series can be assorted together with the Washable Paper Book Cover or the Transparent PVC Book Cover.
- Size: 3.7 in x 6.6 in (9.5cm x 17cm)
- Tomoe River Paper 68 gsm
- 60 pages total (40 pages of project plan, 18 pages of grid note, 1 welcome page, and 1 personal info page)
- 4mm grid
- More Take A Note

